Install new traffic signal at Parkside Drive & Geoffrey Street
Client:
City of Toronto
Industry Served:
Road construction
Location(s):
City of Toronto
Description of Work:
TM3 Inc. was responsible for installing permanent traffic signals on this project. The work included the installation of pole bases, conduit, poles, arms, traffic and pedestrian signal heads as well as the sidewalk reconstruction.
James Snow Parkway
Project:
MTO 2014-2005-Upgrades to existing bridge structures at First Line, James Snow Parkway and Trafalgar Road
Client:
Ministry of Transportation
Industry Served:
Road construction
Location(s):
Milton, ON
Description of Work:
TM3 Inc. was responsible for the installation of both temporary and permanent traffic signals on this project. The work included the installation of pole bases, conduit, traffic signal and street lighting poles, arms and fixtures, as well as traffic and pedestrian signal heads. We were also responsible for the installation of the loop detection system along Hwy 401 between Trafalgar Road and First Line.
Toronto Hydro Street Lighting
Project:
Toronto Hydro street lighting maintenance contract
Client:
Toronto Hydro
Industry Served:
Roadway lighting
Location(s):
City of Toronto
Description of Work:
TM3 Inc. is responsible for providing 24 hour routine and non-routine maintenance of all street lights in the City of Toronto. The work includes the installation of luminaires, lamps, photocells, relays, pole bases, conduits, faults, underground and overhead cable installation, as well as night patrol. We also respond to any emergency that involves the street lighting plant within Toronto and maintain both the Don Valley Parkway (DVP) and Gardner Expressway which includes all high mast and conventional lighting systems.
Traffic Signal & Street Lighting Contracts
Project:
Area maintenance contract 2010-08
Client:
Ministry of Transportation
Industry Served:
Roadway maintenance
Location(s):
North to Tobermory, east to the Town of Blue Mountain, south to Fergus and west to London
Description of Work:
TM3 Inc. provides 24 hour routine and non-routine traffic signal and street lighting maintenance. We perform the following duties on a regular basis; spring and fall cabinet inspection/cleanings, traffic signal and street light re-lamping, responding to emergency calls, conflict monitor testing, pole installations, cabinet replacements, rewiring of existing plants, as well as electrical locating services.
LED Retrofits
Project:
Street lighting LED retrofits
Client:
Various municipalities
Industry Served:
Roadway lighting
Location(s):
All of Ontario
Description of Work:
TM3 Inc. is responsible for the removal of existing luminaires and replacing them with LED fixtures. We have installed more than 15,000 LEDs throughout the Province of Ontario.